UC Aerospace capstone: a modular high-speed fixed-wing UAV development platform.
Project Huia-Controls was one of three major capstone projects completed by the University of Canterbury Aerospace Club in 2026. The project was divided into two teams, Structures and Avionics/Controls, working towards the shared goal of developing a modular aircraft platform that future teams can use to test different designs and configurations. The eventual aim is to challenge the current EDF-powered UAV speed record of 495 km/h.
On October 25th, Project Huia reached a major milestone with its maiden flight at Burnham Field, reaching a top speed of 202 km/h and remaining airborne for 3 minutes and 44 seconds. Considering that the composite aircraft was designed, manufactured, assembled, and flown within a single year, this was a fantastic achievement for both teams.
My primary contributions were the development of a six-degree-of-freedom (6DOF) flight dynamics model in MATLAB and Simulink, autopilot integration and testing, and work on control surface sizing and specifications.
The simulation models the aircraft's aerodynamic forces and moments, propulsion, gravity, and physical properties to reproduce its flight behaviour. As the aircraft design evolved, I developed automated tools for regenerating the aerodynamic coefficients so the model stayed in step with the latest geometry.
I integrated the simulation with ArduPilot through a software-in-the-loop (SITL) interface, allowing the flight controller to be tested and evaluated in a simulated environment before any physical flight testing.
The model was validated against wind-tunnel measurements and real flight data collected during the maiden flight. Replaying the recorded control inputs through the simulation reproduces the measured roll response closely.
The project has been a fantastic learning experience, particularly in flight dynamics, simulation, control systems, and simulation validation. It also gave me the opportunity to independently develop a GN&C simulation and testing framework from the ground up. After a year of development and testing, seeing Huia finally take to the air was incredibly rewarding, and I'm excited to see where future teams take the platform.
A huge thank you to everyone who helped make Project Huia possible, especially the rest of the team and project supervisors.